由射流冲击引起的物理喷溅量达到最大值。建立了重钢85 t转炉复吹工艺参数:冶炼前期顶枪枪位为1600~1760 mm
底吹流量240~350 m
3
/h;中期两参数分别为1100~1300 mm和160~200 m
3
/h
后期两参数分别为1040~1120 mm和200~350 m
3
/h。
Abstract
The effect of top lance level and bottom blowing flowrate on mixed time in bath
mouth spraying
penetration depth in steel and liquid surface fluctuation have been studied by 1:8 water modelling of a 85 t top-bottom combined blown converter at Chongqing Steel. The test results showed that maximum stirring energy was obtained as the top lance level was at 50~100 mm and the spraying amount caused by top lance jet penetration was up to maximum as the top lance level was at 90~110 mm.The top-bottom blown parameters for the 85 t converter at Chongqing Steel has been established that in primary phase of melting the top lance level is 1600~1760 mm and the bottom blowing flowrate is 240~350 m³/h; in second phase both parameters are 1100~1300 mm and 160~200 m³/h respectively; and in later phase both are 1040 ~ 1120 mm and 200~350 m³/h.