吕亚, 王新志, 胡锐, et al. Calculation and Application of Charging Material and Heat Balance in 150 t Top and Bottom Combined Blown Converter[J]. Special Steel, 2011, 32(3): 33-36.
吕亚, 王新志, 胡锐, et al. Calculation and Application of Charging Material and Heat Balance in 150 t Top and Bottom Combined Blown Converter[J]. Special Steel, 2011, 32(3): 33-36.DOI:
Based on data of 150 t converter steelmaking at Anyang Steel
the calculation of charging material balance and heat balance have been carried out and a calculation model is established. With optimum scheme
the multi - cycles calculation on the charging material and heat balance has been carried out to get a reasonable ratio of charging structure
the physical heat of heat balance of liquid and slag making up 75% of total heat expenditure
the physical heat of scrap making up 6% ~ 7% of total heat expenditure
and with the crap ratio being 7% ~ 10%
the consumption of iron and steel charging material decreases by 5. 9 kg per ton of steel and the production cost reduces about 26. 14 Yuan per ton of steel.