通过100 t DC电弧炉-LF-VD-5流260 mm×340 mm连铸-轧制流程开发了石油套管(φ139.7 mm×7.72 mm)用钢25CrMoTi(/%:0.23~0.29C、0.15~0.35Si、0.50~0.70Mn、0.015~0.035Ti、≤0.015P、≤0.003S、0.50~0.70Cr、0.25~0.35Mo、0.010~0.025Alt)。通过电弧炉配加50%铁水
控制钢中有害元素As+Sn+Pb+Sb+Bi≤0.035%
高碱度渣(CaO)/(SiO
2
)=4精炼
控制[S
]
≤0.002%
VD真空处理后喂Ti线
并进行钙处理
控制Ca/S为1.5~2.0
连铸全程保护浇铸
采用结晶器和末端电磁搅拌
管坯中心疏松为1.0级
一般疏松、中心偏析为0.5级
各类非金属夹杂物≤0.5级。在H
2
S饱和溶液中720 h的应力腐蚀试验后钢管表面无裂纹
满足C90-1石油套管的使用要求。
Abstract
The steel 25CrMoTi (/%: 0.23 〜0.29C
0. 15 〜0. 35Si
0. 50 ~0.70Mn
0.015 ~QO35Ti
≤0. 015P
≤0. 003S
0. 50 -0. 70Cr
0. 25 〜0. 35Mo
0. 010 -0. 025Alt) for petroleum casing tube (φ139. 7 mm x 7. 72 mm) has been developed by 100 t DC arc furnace- LF-VD-5 strand 260 mm x 340 mm bloom casting-rolling process. With adding 50% hot metal in arc furnace steelmaking to control the deleterious elements content in steel (As + Sn + Pb + Sb + Bi ≤0. 035%)
refining with high basicity slag- (CaO)/ (SiO2) = 4 to control [S] ≤0. 002%
after VD process feeding Ti wire and carrying out calcium treatment to control Ca/S = 1.5 ~2. 0
whole process shield casting and using M-EMS and F-EMS
the rating of tube bloom central porosity is 1.0
the rating of general porosity and the rating of central segregation are 0. 5
and the rating of each kind of inclusions is W0. 5. After stress corrosion test in saturated H2S solution for 720 h the tube surface hasn't crack that meets the requirement for service of C90-1 grade petroleum casing tube.