您当前的位置:
首页 >
文章列表页 >
Production   Practice of  150 mm×150 mm  Concasting Billet of Steel  ML08Al
更新时间:2026-01-21
    • Production   Practice of  150 mm×150 mm  Concasting Billet of Steel  ML08Al

    • Special Steel   Vol. 27, Issue 3, Pages: 51-52(2006)
    • Received:09 December 2005

      Online First:11 March 2023

      Published:11 March 2006

    移动端阅览

  • 郭平, 郑颖, 石玉宏. Production   Practice of  150 mm×150 mm  Concasting Billet of Steel  ML08Al[J]. Special Steel, 2006, 27(3): 51-52. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimum of Mould Taper Design for Slab Casting of Austenite Stainless Steel
Application and Numerical Simulation of Molten Steel Flow Field in Tundish for Alloy Steel Billet Concasting
Process Practice of Gear Steel 20CrMnTiH Production with 70 t LD-LF-CC Flow Sheet at Chengde Jianlong Steel
Process Practice of a 70 t High Impedance UHP Electric Arc Furnace
Effect of Fluid Flow Control Devices on Optimization of Flow Field in Tundish for Slab Casting

Related Author

张建国
赵建伟
王宝峰
丁国
朱立光
王硕明
刘志国
梁玫

Related Institution

内蒙古科技大学
太原钢铁公司技术中心
河北理工大学冶金能源学院
石家庄钢铁公司技术中心
东北大学材料与冶金学院
0