Process Practice of Tap-to-Tap Time Controlling for an 100 t AC Shaft Arc Furnace at Anyang Steel
|更新时间:2026-01-21
|
Process Practice of Tap-to-Tap Time Controlling for an 100 t AC Shaft Arc Furnace at Anyang Steel
Special SteelVol. 26, Issue 6, Pages: 50-51(2005)
作者机构:
安阳钢铁股份有限公司第一炼轧厂,安阳,455004
作者简介:
基金信息:
DOI:
CLC:
Received:02 June 2005,
Online First:13 April 2023,
Published:13 April 2005
稿件说明:
移动端阅览
张殿军, 梁世勇, 宋万平, et al. Process Practice of Tap-to-Tap Time Controlling for an 100 t AC Shaft Arc Furnace at Anyang Steel[J]. Special Steel, 2005, 26(6): 50-51.
DOI:
张殿军, 梁世勇, 宋万平, et al. Process Practice of Tap-to-Tap Time Controlling for an 100 t AC Shaft Arc Furnace at Anyang Steel[J]. Special Steel, 2005, 26(6): 50-51.DOI:
Process Practice of Tap-to-Tap Time Controlling for an 100 t AC Shaft Arc Furnace at Anyang Steel
An 100 t AC shaft are furnace with transformer rating capacity 60~ 72 MVA was put into production at An- yang Steel in November 1999.With adopted the operation technology such as charging about 33% hot metal
shaft preheating temperature of scrap between 400 ℃ and 600°℃
oxygen-oil burner and water cooling oxygen jet operation and OBT tapping(taping amount 110 t)
the electric power consumption of arc furnace has decrease to 220 kWh/t
the operation rate is up to 92%
average tap-to-tap time 41 min
the annual output over one million to obviously decrease production cost.