您当前的位置:
首页 >
文章列表页 >
Optimization of Bloom Casting Process for R3 Grade Offshore Mooring Chain Steel
更新时间:2026-01-21
    • Optimization of Bloom Casting Process for R3 Grade Offshore Mooring Chain Steel

    • Special Steel   Vol. 30, Issue 6, Pages: 42-44(2009)
    • Received:26 June 2009

      Online First:29 November 2022

      Published:29 November 2009

    移动端阅览

  • 季克进, 陈继红, 陈君, et al. Optimization of Bloom Casting Process for R3 Grade Offshore Mooring Chain Steel[J]. Special Steel, 2009, 30(6): 42-44. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Preventive Measures of Widmanstatten Structure of 0.45 % C Steel for Automobile Piston Rod and Process Optimization
Process Optimization Steel 30CrMnSiA Production by EAF+LF(VD)-ESR  Combined  Process
A Study on Water Model for Circulation Flow Rate Optimization in RH Degassing Refining
Math Simulation and Process Optimization on Bottom-Blowing System of 120 t top and Bottom Combined Blown Converter
Optimization of Slab Concasting Process of 9 % Ni Steel for Liquefied Natural Gas Tank

Related Author

吴豪明
任建忠
杨浩
王毅
李合意
周从惠
张洲
贾楠

Related Institution

河南济源钢铁(集团)有限公司
大冶特殊钢股份有限公司
北京科技大学冶金与生态工程学院
中冶华天工程技术有限公司
太原不锈钢股份有限公司技术中心,太原O3OOO3
0