Study on Performance of High Al2O3 Slag and Smelting Practice of 1 750 m3 Blast Furnace at Jiyuan Steel
|更新时间:2026-01-21
|
Study on Performance of High Al2O3 Slag and Smelting Practice of 1 750 m3 Blast Furnace at Jiyuan Steel
Special SteelVol. 33, Issue 6, Pages: 25-28(2012)
作者机构:
作者简介:
基金信息:
DOI:
CLC:
Received:02 June 2012,
Online First:28 September 2022,
Published:28 September 2012
稿件说明:
移动端阅览
李荣, 郭江, 王玉莲. Study on Performance of High Al2O3 Slag and Smelting Practice of 1 750 m3 Blast Furnace at Jiyuan Steel[J]. Special Steel, 2012, 33(6): 25-28.
DOI:
李荣, 郭江, 王玉莲. Study on Performance of High Al2O3 Slag and Smelting Practice of 1 750 m3 Blast Furnace at Jiyuan Steel[J]. Special Steel, 2012, 33(6): 25-28.DOI:
Study on Performance of High Al2O3 Slag and Smelting Practice of 1 750 m3 Blast Furnace at Jiyuan Steel