您当前的位置:
首页 >
文章列表页 >
Practice on First Deslagging Process of Double Slag Dephosphorization in 120 t Top and Bottom Combined Blown Converter
更新时间:2026-01-21
    • Practice on First Deslagging Process of Double Slag Dephosphorization in 120 t Top and Bottom Combined Blown Converter

    • Special Steel   Vol. 34, Issue 6, Pages: 30-32(2013)
    • Received:22 May 2013

      Online First:06 September 2022

      Published:06 September 2013

    移动端阅览

  • 武贺, 李晶, 周朝刚, et al. Practice on First Deslagging Process of Double Slag Dephosphorization in 120 t Top and Bottom Combined Blown Converter[J]. Special Steel, 2013, 34(6): 30-32. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Process Practice for Production of Caterpillar Track Steel 35MnBM by 90    t    EAF-LF(VD)-CC-CR    Flow    Sheet
Operation Practice of High Carbon Chromium Bearing Steel Produced by LD-LF+VD Process
Practice of Process for Steel 38CrMoAl Produced by 100  t  EBT  Arc  Furnace-LF-CC  Flow  Sheet
Process Practice of Non-Aluminum Deoxidation for Spring Steel Steelmaking Production by 100 t DC EAF-LF -VD Flow Sheet
Math Simulation and Process Optimization on Bottom-Blowing System of 120 t top and Bottom Combined Blown Converter

Related Author

朱志欣李艾王秀兰
林纲
曹立国
郁健
李士琦
余国松
余国松
杜建新

Related Institution

东北特钢集团北满特殊钢有限责任公司
北京科技大学冶金与生态工程学院
中咨工程建设监理公司总工办
石家庄钢铁有限贲任公司炼钢厂
杭州钢铁集团公司技术中心
0