Process Practice for Improving Service Life of Submerged Nozzle in Mold by using Double-Slag-Line Operation
|更新时间:2026-01-21
|
Process Practice for Improving Service Life of Submerged Nozzle in Mold by using Double-Slag-Line Operation
Special SteelVol. 35, Issue 6, Pages: 32-34(2014)
作者机构:
江苏省(沙钢)钢铁研究院,张家港,215625
作者简介:
基金信息:
DOI:
CLC:
Received:30 June 2014,
Online First:19 August 2022,
Published:19 August 2014
稿件说明:
移动端阅览
于学森, 沈奎, 廖舒纶, et al. Process Practice for Improving Service Life of Submerged Nozzle in Mold by using Double-Slag-Line Operation[J]. Special Steel, 2014, 35(6): 32-34.
DOI:
于学森, 沈奎, 廖舒纶, et al. Process Practice for Improving Service Life of Submerged Nozzle in Mold by using Double-Slag-Line Operation[J]. Special Steel, 2014, 35(6): 32-34.DOI:
Process Practice for Improving Service Life of Submerged Nozzle in Mold by using Double-Slag-Line Operation
Based on the analysis on eroding mechanism of casting mold powder to aluminum-zirconium submerged nozzle during casting 6 strand 140 mm x 140 mm billet
with controlling the liquid level in mold from original plane straight line form to up-and-down periodical fluctuation twist line form ( amplitude 5 mm and cycle for 2 h) and casting for 5 h
then rising tundish by 20 ~ 40 mm to change the position of slag line of nozzle
the eroding depth of submerged nozzle obviously decreases by enlarging the eroded area of nozzle. Production results show that in the condition that the nozzle is used for 8 h
the eroding depth of submerged nozzle decreases from 15 mm before process optimization to 5. 5 mm after process optimization. The strength of submerged nozzle is improved to avoid stopping casting due to exchanging broken nozzle. And the service life of submerged nozzle is improved from 8 h to 10 ~ 12 h.