Process Practice on Control of Nitrogen Pick-up in Molten Steel during 150 t Ladle Furnace (LF) Refining Process
更新时间:2026-01-21
    • Process Practice on Control of Nitrogen Pick-up in Molten Steel during 150 t Ladle Furnace (LF) Refining Process

    • Special Steel   Vol. 36, Issue 1, Pages: 25-27(2015)
    • Received:07 August 2014

      Online First:29 August 2022

      Published:29 August 2015

    移动端阅览

  • 杜和平, 杨志才. Process Practice on Control of Nitrogen Pick-up in Molten Steel during 150 t Ladle Furnace (LF) Refining Process[J]. Special Steel, 2015, 36(1): 25-27. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis on Formation of Transverse Crack at Corner of Concasting Bloom of Low Carbon Steel and Control Technology
Prediction of Molten Steel End Point Temperature in LF Based on Modified Artificial Neural Network
Process Practice for Production of Caterpillar Track Steel 35MnBM by 90    t    EAF-LF(VD)-CC-CR    Flow    Sheet
Operation Practice of High Carbon Chromium Bearing Steel Produced by LD-LF+VD Process
Practice of Process for Steel 38CrMoAl Produced by 100  t  EBT  Arc  Furnace-LF-CC  Flow  Sheet

Related Author

钱刚
阮小江
冷永磊
陶子玉
姜茂发
刘承军
朱志欣李艾王秀兰
林纲

Related Institution

江阴兴澄特种钢铁有限公司一炼钢厂,江阴
北京科技大学
东北大学材料与冶金学院
东北特钢集团北满特殊钢有限责任公司
北京科技大学冶金与生态工程学院
0