Practice and Exploration on Raising Scrap Ration during Steelmaking with V-Ti Hot Metal
|更新时间:2026-01-21
|
Practice and Exploration on Raising Scrap Ration during Steelmaking with V-Ti Hot Metal
Special SteelVol. 39, Issue 5, Pages: 21-23(2018)
作者机构:
攀钢集团西昌钢钒有限公司炼钢厂,西昌,615000
作者简介:
基金信息:
DOI:
CLC:
Received:03 April 2018,
Online First:27 May 2022,
Published:27 May 2018
稿件说明:
移动端阅览
张彦恒, 周海龙, 喻林, et al. Practice and Exploration on Raising Scrap Ration during Steelmaking with V-Ti Hot Metal[J]. Special Steel, 2018, 39(5): 21-23.
DOI:
张彦恒, 周海龙, 喻林, et al. Practice and Exploration on Raising Scrap Ration during Steelmaking with V-Ti Hot Metal[J]. Special Steel, 2018, 39(5): 21-23.DOI:
Practice and Exploration on Raising Scrap Ration during Steelmaking with V-Ti Hot Metal
Xichang company's steelmaking plant adopts duplex steelmaking process which includes vanadiuniextrac- ting and steelmaking. In the process
vanadium extracting reduces the total heat. After vanadium extracting
the product is called semi-steel. Compared with normal hot metal
semi-steel causes lots of steelmaking problems such as heat lack and low quality steel slag
for its low carbon and silicon and manganese and temperature. All of those mentioned limit plant
'
s scrap metal and pig iron consumption. Through exploration and study
the total scrap ration is smoothly raised from 2% ~ 6% to 7% ~ 10%. Meanwhile
the converter refractory brick and steel clearness are safe. The plant's scrap ration takes a leading position in the steelmaking plants using V-Ti hot metal.