At revamping for recover production of 100 t EAF at Anyang Iron and Steel Co the original wall oxygen-fuel burners is replaced by wall three Cojet coherent jet oxygen lances. After revamping and recover production of the 100 t EAF
with charging 80 t scrap + 30 t pig iron the EAF tap-to-tap time is 55 min with power consumption 360 kWh/t and electrode consumption 1. 6 k/t; and with charging 60% scrap +40% hot metal the EAF tap-to-tap time is 50 min with power consumption 225 kWh/t and electrode consumption 1. 2 kg/t to realize EAF low cost and high efficiency running.