您当前的位置:
首页 >
文章列表页 >
Application of Particle Injection Dephosphorization Process on Steelmaking of 130 t Electric Arc Furnace
更新时间:2026-01-21
    • Application of Particle Injection Dephosphorization Process on Steelmaking of 130 t Electric Arc Furnace

    • Special Steel   Vol. 44, Issue 1, Pages: 34-38(2023)
    • DOI:10.20057/j.1003-8620.2022-00073    

      CLC:
    • Received:08 August 2022

      Online First:30 January 2023

      Published:30 January 2023

    移动端阅览

  • 陈军召, 张彦辉, 谈岸童, et al. Application of Particle Injection Dephosphorization Process on Steelmaking of 130 t Electric Arc Furnace[J]. Special Steel, 2023, 44(1): 34-38. DOI: 10.20057/j.1003-8620.2022-00073.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Practice of Economical Smelting of Q355 Steel in Converter
The Smelting Process Improvement of 120 t Top-Bottom Combined Blown Converter with High-Carbon Turndown and Low Phosphorus Tapping
Optimization and Simulation of Stirring Process for 100 t Electric Arc Furnace Bath and Its Application
Experimental Study on Dephosphorization of X80 Pipeline Steel by Duplex Steelmaking Technology for Combined Blowing Converter
Analysis and Process Practice on Steelmaking Technology of 100 t Top-Blown Oxygen Converter by Limestone for Slag Making

Related Author

Yang Yongkun
Geng Bin
Huang Gaojian
Wei Zehong
Song Huan
Zhan Dongping
Zhang Fudong
Wu Bo

Related Institution

Steelmaking Plant of Baowu Group Echeng Iron and Steel Co., Ltd
School of Metallurgy, Northeastern University
School of Metallurgical Engineering, Xi’an University of Architecture and Technology
Handan Iron & Steel Group Design institute Co., Ltd., HBIS GROUP
No.1Steelmaking Plant , HBIS GROUP HANSTEEL COMPANY
0