您当前的位置:
首页 >
文章列表页 >
Operation Practice of High Carbon Chromium Bearing Steel Produced by LD-LF+VD Process
更新时间:2026-01-21
    • Operation Practice of High Carbon Chromium Bearing Steel Produced by LD-LF+VD Process

    • Special Steel   Vol. 28, Issue 6, Pages: 43-45(2007)
    • Received:08 June 2007,

      Online First:28 December 2022,

      Published:28 December 2007

    移动端阅览

  • 林纲, 曹立国, 郁健, et al. Operation Practice of High Carbon Chromium Bearing Steel Produced by LD-LF+VD Process[J]. Special Steel, 2007, 28(6): 43-45. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Process Practice for Production of Caterpillar Track Steel 35MnBM by 90    t    EAF-LF(VD)-CC-CR    Flow    Sheet
Practice of Process for Steel 38CrMoAl Produced by 100  t  EBT  Arc  Furnace-LF-CC  Flow  Sheet
Process Practice of Non-Aluminum Deoxidation for Spring Steel Steelmaking Production by 100 t DC EAF-LF -VD Flow Sheet
Development of Tire Cord Steel XLX72A by 80 t Top and Bottom Combined Blown Converter-LF Nol-LF No2-VD-CC Flow Sheet
Practice of Control for [Ti] Melting Loss during Stainless Steel 1Cr18Ni9Ti 1.2 t Ingot ESR Process

Related Author

朱志欣李艾王秀兰
余国松
余国松
杜建新
吴胜军
何润
周立新
胡长伟

Related Institution

东北特钢集团北满特殊钢有限责任公司
杭州钢铁集团公司技术中心
杭州钢铁集团公司1技术中心
昌兴公司
湘潭钢铁有限公司
0