Finite Element Analysis on 100-Meter Rail Temperature Field of U75V Steel during Cooling before Straightening
|更新时间:2026-01-21
|
Finite Element Analysis on 100-Meter Rail Temperature Field of U75V Steel during Cooling before Straightening
Special SteelVol. 30, Issue 1, Pages: 1-3(2009)
作者机构:
1. 内蒙古科技大学,1建筑与土木工程学院
2. 材料与冶金学院,包头,014010
作者简介:
基金信息:
DOI:
CLC:
Received:21 July 2008,
Online First:28 November 2022,
Published:28 November 2009
稿件说明:
移动端阅览
李革, 崔海燕, 陈林. Finite Element Analysis on 100-Meter Rail Temperature Field of U75V Steel during Cooling before Straightening[J]. Special Steel, 2009, 30(1): 1-3.
DOI:
李革, 崔海燕, 陈林. Finite Element Analysis on 100-Meter Rail Temperature Field of U75V Steel during Cooling before Straightening[J]. Special Steel, 2009, 30(1): 1-3.DOI:
Finite Element Analysis on 100-Meter Rail Temperature Field of U75V Steel during Cooling before Straightening
With analyzing the thermal boundan conditions in cooling process of U75 V steel rail
the temperature field of 100 in steel rail during cooling process at 845 ~ 150 ℃ before straightening has been calculated by using three-dimensional non-linear finite element method. Results showed that during cooling process the temperature decrease rate was different at different position of cross- section of rail
in initial cooling period (200 ~2 000 s) a "platform'' period with temperature decreasing slow for each curve occurred
for instance the cooling rate was fastest at edge of rail bottom at which the phase transition was earliest: in cooling for 2 500 ~ 3 000 s
the temperature at rail head
rail waist and median of rail bottom decreased very quickly and the temperature difference between rail head and edge of rail bottom was about 5℃
in cooling for 5 000 ~ 7 000 s the temperature of each position tended to show no difference; the difference between calculated temperature and measured temperature at situ was less than 50℃.