您当前的位置:
首页 >
文章列表页 >
Optimization of Control Process of a 210 t Top and Bottom Combined Blown Converter Steelmaking
更新时间:2026-01-21
    • Optimization of Control Process of a 210 t Top and Bottom Combined Blown Converter Steelmaking

    • Special Steel   Vol. 32, Issue 1, Pages: 34-35(2011)
    • Received:31 August 2010,

      Online First:27 September 2022,

      Published:27 September 2011

    移动端阅览

  • 刘霞, 王晓丽, 张昭, et al. Optimization of Control Process of a 210 t Top and Bottom Combined Blown Converter Steelmaking[J]. Special Steel, 2011, 32(1): 34-35. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Test and Study of Water Model Simulation for 300 t Converter
Preventive Measures of Widmanstatten Structure of 0.45 % C Steel for Automobile Piston Rod and Process Optimization
Process Optimization Steel 30CrMnSiA Production by EAF+LF(VD)-ESR  Combined  Process
Optimization of Bloom Casting Process for R3 Grade Offshore Mooring Chain Steel
A Study on Water Model for Circulation Flow Rate Optimization in RH Degassing Refining

Related Author

刘竹林
高泽平
贺志宏
吴豪明
任建忠
杨浩
王毅
李合意

Related Institution

湖南工业大学冶金工程系
湘潭钢铁集团有限公司
河南济源钢铁(集团)有限公司
大冶特殊钢股份有限公司
大冶特殊钢股份有限公司,1质量检验部
0