Calculation and Application of Charging Material and Heat Balance in 150 t Top and Bottom Combined Blown Converter
|更新时间:2026-01-21
|
Calculation and Application of Charging Material and Heat Balance in 150 t Top and Bottom Combined Blown Converter
Special SteelVol. 32, Issue 3, Pages: 33-36(2011)
作者机构:
1. 安阳钢铁集团有限责任公司第二炼轧厂,安阳,455004
2. 山西工程职业技术学院,太原,030009
3. 南京铁道职业技术学院(苏州校区),苏州,215137
作者简介:
基金信息:
DOI:
CLC:
Received:05 December 2010,
Online First:18 October 2022,
Published:18 October 2011
稿件说明:
移动端阅览
吕亚, 王新志, 胡锐, et al. Calculation and Application of Charging Material and Heat Balance in 150 t Top and Bottom Combined Blown Converter[J]. Special Steel, 2011, 32(3): 33-36.
DOI:
吕亚, 王新志, 胡锐, et al. Calculation and Application of Charging Material and Heat Balance in 150 t Top and Bottom Combined Blown Converter[J]. Special Steel, 2011, 32(3): 33-36.DOI:
Calculation and Application of Charging Material and Heat Balance in 150 t Top and Bottom Combined Blown Converter
Based on data of 150 t converter steelmaking at Anyang Steel
the calculation of charging material balance and heat balance have been carried out and a calculation model is established. With optimum scheme
the multi - cycles calculation on the charging material and heat balance has been carried out to get a reasonable ratio of charging structure
the physical heat of heat balance of liquid and slag making up 75% of total heat expenditure
the physical heat of scrap making up 6% ~ 7% of total heat expenditure
and with the crap ratio being 7% ~ 10%
the consumption of iron and steel charging material decreases by 5. 9 kg per ton of steel and the production cost reduces about 26. 14 Yuan per ton of steel.