Math Simulation on Casting and Solidifying Process of 1.9 t Slab Ingot of Cold Working Die Steel D2 and Internal Defect Prediction
|更新时间:2026-01-21
|
Math Simulation on Casting and Solidifying Process of 1.9 t Slab Ingot of Cold Working Die Steel D2 and Internal Defect Prediction
Special SteelVol. 32, Issue 3, Pages: 5-8(2011)
作者机构:
1. 鞍钢集团工程技术有限公司,鞍山,114001
2. 辽宁科技大学材料与冶金学院,鞍山,114051
作者简介:
基金信息:
DOI:
CLC:
Received:26 December 2010,
Online First:17 October 2022,
Published:17 October 2011
稿件说明:
移动端阅览
李英, 苑晓冬, 张东伟, et al. Math Simulation on Casting and Solidifying Process of 1.9 t Slab Ingot of Cold Working Die Steel D2 and Internal Defect Prediction[J]. Special Steel, 2011, 32(3): 5-8.
DOI:
李英, 苑晓冬, 张东伟, et al. Math Simulation on Casting and Solidifying Process of 1.9 t Slab Ingot of Cold Working Die Steel D2 and Internal Defect Prediction[J]. Special Steel, 2011, 32(3): 5-8.DOI:
Math Simulation on Casting and Solidifying Process of 1.9 t Slab Ingot of Cold Working Die Steel D2 and Internal Defect Prediction
The casting and solidification process of 1. 9 t slab ingot of steel D2 (% : 1.40 - 1. 60C
11.00 ~ 13. 00Cr
0. 70 〜1.20Mo
≤1.10V) have been simulated by using three-dimension foundry software Procast. Results show that the solidification time of 1.9 t slab ingot body and whole ingot are respectively 64 min and 83 min
it corresponds with calculation results by experience formula; the columnar crystal thickness is about 150 mm and the width of equiaxed crystal zone is about 260 mm; and there is no shrinkage cavity in 1. 9 t slab ingot only with slight porosity.