您当前的位置:
首页 >
文章列表页 >
Physical Simulation on Pre-Desulfurization Technology in a 300 t Ladle by Top and Bottom Combined Argon Blowing
更新时间:2026-01-21
    • Physical Simulation on Pre-Desulfurization Technology in a 300 t Ladle by Top and Bottom Combined Argon Blowing

    • Special Steel   Vol. 32, Issue 6, Pages: 1-3(2011)
    • Received:30 May 2011,

      Online First:14 October 2022,

      Published:14 October 2011

    移动端阅览

  • 朱伦才, 焦兴利. Physical Simulation on Pre-Desulfurization Technology in a 300 t Ladle by Top and Bottom Combined Argon Blowing[J]. Special Steel, 2011, 32(6): 1-3. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Water Modelling for a 85 t Top-Bottom Combined Blown Converter at Chongqing Steel
Water Modelling Test on Interaction between Bottom Injection Gas and Bath for an 180 t Converter#br#
Physical and Mathematical Study on Flow Control Device of Tundish for 5-Strand billet Casting at Chongqing Steel
Experiment on Optimum Location of Bottom Nozzle in a 130 t Argon Stirred Ladle by Water Model
A Study on Water Model for Structure Optimization of Submerged Entry Nozzle with Cross Outlet for Thin Slab Concasting

Related Author

鱼洋洋
唐萍
周亮
龙贻菊
陈文满
梁庆
安昌遐
包丽明刘坤吕国成苏东磊

Related Institution

重庆钢铁公司炼钢厂
重庆大学材料科学与工程学院
辽宁科技大学材料学院,鞍山4
重庆钢铁集 团有 限公 司
武汉科技大学钢铁冶金及资源利用省部共建教育部重点实验室
0