An Analysis on Creep-Fatigue Failure of Main Steam Pipe of 12CrMoV Steel
Wang Haiyan1 , Gao Xueyuan2, Liu Zongchang1, Wang Yufeng1
1 Material and Metallurgy College, Inner Mongolia University of Science and Technology, Baotou 014010 ;
2 The First Power Station of Baotou, Baotou 014010
Wang Haiyan, Gao Xueyuan, Liu Zongchang, Wang Yufeng. An Analysis on Creep-Fatigue Failure of Main Steam Pipe of 12CrMoV Steel[J]. Special Steel, 2009, 30(1): 68-69.