Practice on First Deslagging Process of Double Slag
Dephosphorization in 120 t Top and Bottom
Combined Blown Converter
Wu He1,2, Li Jin1,2, Zhou Chaogang1,2, Cai Kesen3, Wu Guoping3 , Cao Yuliang3
1 School of Metallurgical and Ecological Engineering ;
2 State key Laboratory of Advanced Metallurgy, University of
Science and Technology, Beijing 100083;
3 Nanjing Iron and Steel Corp, Nanjing 210035
Wu He, Li Jin, Zhou Chaogang, Cai Kesen, Wu Guoping, Cao Yuliang. Practice on First Deslagging Process of Double Slag
Dephosphorization in 120 t Top and Bottom
Combined Blown Converter[J]. Special Steel, 2013, 34(6): 30-32.
[1]魏寿坤.冶金过程热力学[M].北京:科学出版社,2010: 214-235.
[2]曲英.炼钢学原理(第二版)[M].北京:冶金工业出版社,
1994.
[3]黄希祜.钢铁冶金原理(第3版)[M].北京:冶金工业出版社, 2004.
[4]Turkdogan E T, Pearson J. Activities of Constituents of Iron and Steelmaking Slags[J]. Journal of the Iron and Steel Institute, 1953 (12):398-401.
[5]李建新,郝旭东,仇圣桃,等.复吹转炉多功能法脱磷工艺[J]. 北京科技大学学报,2009,31(8) :970-973.
[6]赖兆奕,谢 植.转炉多功能精炼法的脱磷过程控制[J].钢铁, 2007,42(11) :34-37.
[7]徐匡迪,肖丽俊.转炉铁水预处理脱磷的基础理论分析[J].上海大学学报(自然科学版),2011,17(4) :331-336.