ISSN:1003-8620

CN:42-1243/TF

Governed by: CITIC Pacific Special Steel Group Co., LTD

Sponsored by: Daye Special Steel Co., LTD.

Special Steel ›› 2014, Vol. 35 ›› Issue (4): 41-43.

Previous Articles     Next Articles

Development of Heavy 21CrMolO Steel Seamless Tube for Mold for Centrifugal Nodular Cast Iron Pipe

Zhang Min, Xia Wenbin, Ran Xu , Wang Yong   

  1. Technical Center, Hengyang Hualing Steel tube Co Ltd, Hengyang 421001
  • Received:2014-02-24 Online:2014-08-01 Published:2022-09-03

大型离心球墨铸铁管管模用21CrMolO钢管的开发

张敏, 夏文斌, 冉旭, 王勇   

  1. 衡阳华菱钢管有限公司技术中心,衡阳421001
  • 作者简介:张 敏(1980-),男,工程师,2003年沈阳大学(本科)毕业, 轧钢新工艺、新产品研究。

Abstract: Two heats of steel 21CrMolO (/%: 0. 18G, 0.29 ~0. 30Si, 0. 25 ~0. 27Mn, 0.007 ~0.008P, 0.003S, 2. 40 ~2.42Cr, 0. 35 ~0. 37Mo) are melted by 30 t EAF-LF-VD-7.2 t casting ingot flow sheet. The T-type steel tube with T-type head outside diameter 860 mm, tube body outside diameter 740 mm, wall thickness 60 mm, total length 6 500 mm is produced by hydraulic punching-reducing piercing-Pilger rolling tube process. Results show that compared with conventional forming process by forging and boring, the Pilgrim rolling process by which the mold mouth and tube body are formed only once is available to greatly increase the yield of raw material ; and the mechanical properties of tube products meet the requirement service.

摘要: 两炉21CrMo10钢(/%:0.18C,0.29~0.30Si,0.25~0.27Mn,0.007~0.008P,0.003S,2.40~2.42Cr,0.35~0.37Mo)由30 t EAF-LF-VD-7.2 t铸锭流程冶炼。T型头外径860 mm,管体外径740 mm,壁厚60 mm,总长度6 500 mm的T型钢管经水压冲孔-减径穿孔-周期轧管工艺生产。结果表明,与传统锻造镗孔成型工艺相比,使用轧管工艺管模承口端与管体一次成型,大幅度提高原材料利用率,成品管的力学性能满足使用要求。