Control Model of Gas Supply System of Bottom Blowing for 120 t Converter and Application Effect
Wang Chengyi1,2, Wu Wei1, Yang Libin1, Zhao Ge1, Luo Qilong1 , Jiang Zhouhua2
1 Metallurgical Department, Central Iron and Steel Research Institute, Beijing 100081 ;
2 School of Metallurgy, Northeastern University, Shengyang 110004
Wang Chengyi, Wu Wei, Yang Libin, Zhao Ge, Luo Qilong , Jiang Zhouhua. Control Model of Gas Supply System of Bottom Blowing for 120 t Converter and Application Effect[J]. Special Steel, 2020, 41(3): 10-14.
[1]冶金部复吹专家组、宝钢设计研究院编.氧气顶底复吹转炉设计 参考[M].北京:冶金工业出版社,1994.
[2]汪成义,王洪伟,林腾昌,等.45 t转炉双渣工艺及底吹系统改造 试验研究[J].工业加热,2018,47( 1 ): 17-20.
[3]Kitamura S, Yonezawa K and Ogawa Y, et al. Improvement of Reaction Efficiency in Hot Metal Dephosphorization [J]. Ironmaking and Steelmaking,2002,29(2) : 121-124.
[4]Yang L B, Liu L and Jiao X L. Study and Application of Bottom Blowing Technique of Combined Blowing Converter [ J ]. Journal of Iron and Steel Research, International ,2014,21 (1) :41-45.
[5]曾加庆,潘贻芳,王立平,等.对复吹转炉低成本、高效化生产洁 净钢水理论与实践的再认识[J].钢铁,2014,49(10):1-6.
[6]李东,胡加学.国内复吹转炉底吹元件研究应用现状及展望[J].中国北京:中国金属学会,2009 :340-344.冶金,2012,22(2):7-9.
[7]佟溥翘,赵进宣,郑丛杰,等.复吹转炉环缝式底吹供气元件的开 发及应用[C].第七届(2009)中国钢铁年会论文集(下)[A].
[8]Sahai Y and Guthrie R I L. The Formation and Growth of Thermal Accretions in Bottom Blown/Combination Blown Steelmaking Operations[J]. IRON&STEEL MAKER,1984,11 (4) :34-38.
[9]赵 舸,何 平.顶底复吹转炉底吹流量优化控制技术[J].特殊钢,2007,28(5).48-50.
[10]武 蹦,包燕平,岳 峰,等.影响转炉终点碳氧积的因素分析 [J].钢铁研究,2010,38(2) :26-29.