A Water-Air Circulation Cooling Process Used for Normalizing Structure and Performance Control of Hypoeutectoid Steel Medium- and Thick-Walled Seamless Steel Pipes
Yang Huangguang1,3, Yao Huoneng1,3, Yang Ling2, Du Kun1,3, Zhang Yangbo1,3
1 Daye Special Steel Co Ltd, Huangshi 435001;
2 Hubei Huangshi Product Quality Supervision and Inspection Institute, Huangshi 435001;
3 Hubei Province Key Laboratory for High Quality Special Steel, Huangshi 435001
Yang Huangguang, Yao Huoneng, Yang Ling , Du Kun , Zhang Yangbo. A Water-Air Circulation Cooling Process Used for Normalizing Structure and Performance Control of Hypoeutectoid Steel Medium- and Thick-Walled Seamless Steel Pipes[J]. Special Steel, 2021, 42(3): 47-51.
[1]杨才福,苏航.高性能船舶及海洋工程用钢的开发[J].钢铁, 2013,47(12):1-8.
[2] El-Bitar T, Gamil M and Mousa I, et al. Development of Carbon- Low Alloy Steel Grades for lOw Temperature Applications [J]. Materials Science and Engineering: A,2011,528( 18) •6039-6044.
[3] 田青超,刘子利.S460NL欧标结构管强韧性机理初探[C].浙江:钢管学会六届五次年会・论文集一工艺技术研究,2015: 103.
[4]左训伟.水-空交替控时淬火冷却设备的研究与应用[C].上海:上海交通大学博士学位论文,2010:2640.
[5]陈春怀,朱祖昌.钢的冷却介质的冷却机制[J].热处理,2011,26 (4) :72-73.
[6]李 静.珠光体相变过程控制对其微观组织尺寸及力学性能的影响规律研究[C].贵州大学硕士学位论文,2017 :6-12、42.