Process Practice of High Hot Metal Charging Rate for an 100 t Finger Shaft Arc Furnace at Anyang Steel
Zhu Rong1, Wang Xinjiang2, Niu Chongjun1,2, Gao Feng1, Hu Zhenbang2
1 Metallurgical and Ecological Engineering,University of Science and Technology,Beijing 100083;
2 No.1 Rolling Mill,Anyang Iron and Steel Co Ltd,Anyang 455004
Zhu Rong, Wang Xinjiang, Niu Chongjun, Gao Feng, Hu Zhenbang. Process Practice of High Hot Metal Charging Rate for an 100 t Finger Shaft Arc Furnace at Anyang Steel[J]. Special Steel, 2008, 29(1): 40-42.
1 张殿军,靳秀礼,刘 栋,等.100t竖式电弧炉兑铁水工艺.特殊钢,2001,22(6);39
2 Andreas Metzen, Gerhard Bunemann, Johannes Greinacher,et al. Oxy- gen Technology for Highly Efficient Electric Arc Steelmaking.MPT In- temational,2000(4):84
3 Jorge Ortega, John Vasquez.Implementation and Operation Results with Cojet?M Gas lrjection System at SIDOR with DRI Charging.2001 Electric Fumace Conference Proceedings:703
4 李桂海,朱荣,仇永全,等.电弧炉炼钢集束射流氧枪的射流特 征.特殊钢,2002,23(1):11
5 张贵,朱 荣,韩丽辉,等.70t电弧炉炼钢集束射流氧枪流场 的数值模拟及应用.特殊钢,2006,27(5):46
6 朱荣.电弧炉炼钢用氧模块化控制理论及工业应用.钢铁,2003(10):16